IDC Re-Engineering Phase 3 Budgetary Cost Estimate Summary (Leveraged NDC Case)
- Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
Sandia National Laboratories has prepared a budgetary cost estimate for planning for the IDC Re-engineering Phase 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the budgetary cost estimate and describes the methodology, assumptions, and cost model details used to create the budgetary cost estimate.
- Research Organization:
- Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE National Nuclear Security Administration (NNSA); DOS
- DOE Contract Number:
- AC04-94AL85000
- OSTI ID:
- 1494177
- Report Number(s):
- SAND--2017-0144; 672220
- Country of Publication:
- United States
- Language:
- English
Similar Records
IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).
IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)
IDC reengineering Phase 2 & 3 US industry standard cost estimate summary
Technical Report
·
Sat Nov 01 00:00:00 EDT 2014
·
OSTI ID:1164983
IDC Reengineering Phase 2 & 3 Cost Estimate Summary (Version 1.0.1)
Technical Report
·
Mon Sep 01 00:00:00 EDT 2014
·
OSTI ID:1531331
IDC reengineering Phase 2 & 3 US industry standard cost estimate summary
Technical Report
·
Wed Dec 31 23:00:00 EST 2014
·
OSTI ID:1167409