Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

Technical Report ·
DOI:https://doi.org/10.2172/152651· OSTI ID:152651
This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.
Research Organization:
Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-91AL62350
OSTI ID:
152651
Report Number(s):
DOE/AL/62350--72-Rev.2; ON: DE96003086
Country of Publication:
United States
Language:
English