UMTRA project technical assistance contractor quality assurance implementation plan
The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.
- Research Organization:
- Jacobs Engineering Group, Inc., Albuquerque, NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC04-91AL62350
- OSTI ID:
- 10147171
- Report Number(s):
- DOE/AL/62350--72D; ON: DE94011045; BR: EW2010102/EX2040010
- Country of Publication:
- United States
- Language:
- English
Similar Records
ERD UMTRA Project quality assurance program plan, Revision 7
UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water
UMTRA Project Office Quality Assurance Program Plan. Revision 5
Technical Report
·
Fri Sep 01 00:00:00 EDT 1995
·
OSTI ID:196542
UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water
Technical Report
·
Thu Sep 01 00:00:00 EDT 1994
·
OSTI ID:10188730
UMTRA Project Office Quality Assurance Program Plan. Revision 5
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:10112218