PRB Coal Surface Mine Assembly, Construction
- National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Calculates the quantity of each piece of equipment needed to extract and produce coal at a large surface mine, mining PRB sub-bituminous coal, over the lifetime of the plant. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=07869307-7A11-46E1-9521-16BB1E28E58B
- Research Organization:
- National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
- Sponsoring Organization:
- USDOE Office of Fossil Energy and Carbon Management (FECM)
- OSTI ID:
- 1509031
- Country of Publication:
- United States
- Language:
- English
Similar Records
Rosebud Surface Sub-Bituminous Coal Mine Assembly, Construction
Longwall Mining System Assembly, Construction
Illinois No. 6 Underground Coal Mine Assembly, Construction
Technical Report
·
Sun Jan 15 23:00:00 EST 2012
·
OSTI ID:1509120
Longwall Mining System Assembly, Construction
Technical Report
·
Sun Jan 24 23:00:00 EST 2010
·
OSTI ID:1509079
Illinois No. 6 Underground Coal Mine Assembly, Construction
Technical Report
·
Mon Nov 30 23:00:00 EST 2015
·
OSTI ID:1509074