Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Illinois No. 6 Underground Coal Mine Assembly, Construction

Technical Report ·
DOI:https://doi.org/10.2172/1509074· OSTI ID:1509074
 [1]
  1. National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Calculates the number of each piece of equipment included in an underground, Illinois No. 6 bituminous coal mine. Includes life expectancy and replacement rates for the longwall mining system, continuous miner, conveyor system, and shuttle car. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=E1F4C19D-E7C9-4385-914A-7432869882D5
Research Organization:
National Energy Technology Laboratory (NETL), Pittsburgh, PA, Morgantown, WV, and Albany, OR (United States)
Sponsoring Organization:
USDOE Office of Fossil Energy and Carbon Management (FECM)
OSTI ID:
1509074
Country of Publication:
United States
Language:
English

Similar Records

Longwall Mining System Assembly, Construction
Technical Report · Sun Jan 24 23:00:00 EST 2010 · OSTI ID:1509079

Illinois No. 6 Coal Preparation Facility Assembly, Construction
Technical Report · Tue Feb 02 23:00:00 EST 2010 · OSTI ID:1509072

Underground Mine, Illinois No. 6 Bituminous Coal, Operation
Technical Report · Mon Apr 01 00:00:00 EDT 2013 · OSTI ID:1509219