The NSLS-II storage ring (SR) phase I commissioning has been successfully completed in May 12, 2014. In accordance to the project milestone, 25 mA average current was achieved in the storage ring with PETRA III 500 MHz 7-cell PETRA-III RF cavity but w/o ID’s and Landau cavities. In about 5 weeks we delivered a 3 GeV beam to the ring injection straight section, made the 1st turn around the ring, achieved hundreds of turns optimizing injection, stored beam having sextupoles and RF turned ON. Injection efficiency was achieved 95%, close orbit rms value is ~100 um, tune and chromaticity were measured and adjusted as desired, and beam lifetime was a few hours depending on the stored beam current. This report consists of a summary, a chronological part, the injector system performance in Ch3, SR commissioning experience in Ch4 and the outlook of remaining work in Ch5. The SR commissioning experience includes the software experience, hardware (timing, diagnostics, RF, vacuum, PS) operation experience, the strategy for initial injection beam to the stored beam, measurement of the linear optics and control to the desired value, nonlinear beam dynamics study, beam instability study, the subsystem reliability and fault study at different scenarios.
Research Organization:
Brookhaven National Laboratory (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Science (SC), Basic Energy Sciences (BES) (SC-22)
DOE Contract Number:
SC0012704
OSTI ID:
1505098
Report Number(s):
NSLSII-ASD-TN--168; BNL--211142-2019-TECH
Country of Publication:
United States
Language:
English

Similar Records

Analysis of coupled-bunch instabilities for the NSLS-II storage ring with a 500MHz 7-cell PETRA-III cavity
Journal Article · Sun Jan 31 23:00:00 EST 2016 · Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment · OSTI ID:1354265

Analysis of coupled-bunch instabilities for the NSLS-II storage ring with a 500MHz 7-cell PETRA-III cavity
Journal Article · Thu Dec 10 19:00:00 EST 2015 · Nuclear Instruments and Methods in Physics Research. Section A, Accelerators, Spectrometers, Detectors and Associated Equipment · OSTI ID:1341524

Commissioning and Early Operation Experience of the NSLS-II Storage Ring RF System
Conference · Sun May 03 00:00:00 EDT 2015 · OSTI ID:1201342

Related Subjects