skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: CW Room Temperature Re-buncher for the PIP-II Linac Front End

Conference ·

At Fermilab there is a plan for improvements to the Fermilab accelerator complex aimed at providing a beam power capability of at least 1 MW on target. The essential element of the plan (the Proton Improvement Plan II – PIP-II) is a new 800 MeV superconducting linac. The PIP-II linac includes a room temperature front-end and high energy part based on five types of superconducting cavities used to cover the entire velocity range required for beam acceleration. The room temperature front end is composed of an ion source, low energy beam transport line (LEBT), radio frequency quadrupole (RFQ), and a medium energy beam transport line (MEBT). The paper reports RF design of the re-buncher for MEBT along with thermal analysis of the cavity.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC), High Energy Physics (HEP)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1487071
Report Number(s):
FERMILAB-CONF-14-127-TD; 1314900
Resource Relation:
Conference: 5th International Particle Accelerator Conference, Dresden, Germany, 06/16-06/20/2014
Country of Publication:
United States
Language:
English

Similar Records

CW Room Temperature Re-Buncher for the Project X Front End
Conference · Wed May 09 00:00:00 EDT 2012 · Conf.Proc.C1205201:3880-3882,2012 · OSTI ID:1487071

PIC Simulations in Low Energy Part of PIP-II Proton Linac
Conference · Tue Jul 01 00:00:00 EDT 2014 · OSTI ID:1487071

Status of the Warm Front End of PIP-II Injector Test
Conference · Mon May 01 00:00:00 EDT 2017 · OSTI ID:1487071

Related Subjects