PIP-II Injector Test Warm Front End: Commissioning Update [Slides]
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test (PIP2IT) at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1462073
- Report Number(s):
- FERMILAB-SLIDES-18-100-AD; oai:inspirehep.net:1683647
- Resource Relation:
- Conference: 9. International Particle Accelerator Conference, Vancouver, BC (Canada), 29 Apr - 4 May 2018
- Country of Publication:
- United States
- Language:
- English
Similar Records
PIP-II Injector Test Warm Front End: Commissioning Update
Status of the Warm Front End of PIP-II Injector Test
Beam Dynamics Studies at the PIP-II Injector Test Facility
Conference
·
Sun Apr 01 00:00:00 EDT 2018
·
OSTI ID:1462073
Status of the Warm Front End of PIP-II Injector Test
Conference
·
Mon May 01 00:00:00 EDT 2017
·
OSTI ID:1462073
+15 more
Beam Dynamics Studies at the PIP-II Injector Test Facility
Conference
·
Wed Aug 24 00:00:00 EDT 2022
·
OSTI ID:1462073
+3 more