Title: Program cost and schedule baseline; Revision 2

Technical Report ·
DOI:https://doi.org/10.2172/138411· OSTI ID:138411

The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of the Radioactive Waste Management Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive Level (Level 0) and Program (Level 1) Change Control Boards (CCBs) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD) and the Waste Management System Requirements (WMSR) documents provides the technical basis for the PCSB. The PCSB establishes baseline values for the Yucca Mountain Site Characterization Project cost and schedule through submittal of the license application to the Nuclear Regulatory Commission (NRC).

Research Organization:
USDOE Office of Civilian Radioactive Waste Management (OCRWM), Washington, DC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
138411
Report Number(s):
DOE/RW-0253-Rev.2; ON: TI92012386
Resource Relation:
Other Information: PBD: Nov 1991