Program cost and schedule baseline. Revision 5, (A00000000-00811-1701-00001)

Technical Report ·
DOI:https://doi.org/10.2172/109650· OSTI ID:109650

The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to chance control by the Executive (Level 0) and Program (Level 1) Baseline Change Control Boards (BCCBs) and establishes their baseline values. The Program technical baseline is contained in the Civilian Radioactive Waste Management System (CRWMS) Requirements Document (CRD) and the System Requirement Documents (SRDs) for the individual system elements. Changes to the PCSB will be approved by the Program Baseline Change Control Board (PBCCB). In addition to the PBCCB, the Energy System Acquisition Advisory Board Baseline Change Control Board (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project, the Waste Acceptance, Storage and Transportation (WAST) Project (formerly Monitored Retrievable Storage (MRS) Project), and Program Integration element.

Research Organization:
USDOE Office of Civilian Radioactive Waste Management, Washington, DC (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
OSTI ID:
109650
Report Number(s):
DOE/RW--0253-Rev.5; ON: DE96000815; NC: NONE
Country of Publication:
United States
Language:
English