Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Gary Works No. 13 blast furnace: A new removable trough design

Conference ·
OSTI ID:129075
;  [1]; ;
  1. U.S. Steel Group, Gary, IN (United States). Gary Works
No. 13 Blast Furnace at US Steel`s Gary Works is a 35 tuyere furnace with a 36.5 ft. hearth capable of producing over 9,000 tons of hot metal per day. The current casthouse design was placed in service following the second reline in the fall of 1979. This design anticipated daily production rates averaging 7,500 tons of hot metal per day and provided for removable troughs at two of the three tapholes. At the time, the troughs were rammed with a high alumina/silicon carbide granular ramming material that provided the operators with trough campaign lives between 60,000--70,000 tons of hot metal produced. As refractory technology progressed, low cement/low moisture castables were introduced to the trough systems on No. 13 Blast Furnace. The immediate success of the castables was tempered by emergence of a new unexpected problem. That problem was the thermal expansion of the castable. The paper describes the problems that resulted in the need to modify the trough design, the new design of the trough, and its improvement in iron trough campaign life and reliability.
OSTI ID:
129075
Report Number(s):
CONF-9504182--; ISBN 0-932897-99-1
Country of Publication:
United States
Language:
English

Similar Records

Single taphole blast furnace casthouse performance optimizing cost and availability
Conference · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:129073

Partnering and the WCI blast furnace reline
Journal Article · Fri Oct 31 23:00:00 EST 1997 · Iron and Steel Engineer · OSTI ID:562279

High productivity injection practices at Rouge Steel
Book · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:129061