Title: Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems

Technical Report ·
DOI:https://doi.org/10.2172/1248140· OSTI ID:1248140
 [1];  [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

Experiment 2078 is planned as the initial phase of the Long-Term Flow Test. As such, it represents the "shakedown cruise" for the entire flowing system in its present configuration -- both the reservoir and the integrated surface plant. Since the Phase II reservoir has been continuously pressurized for the past 2-1/2 years at a mean pressure of about 15 MPa (2180 psi), it is essential to re-establish the relationships between surface injection and production pressures, and the resulting production flow rates. These relationships are needed before proceeding to the first -- aseismic -- phase of steady-state reservoir operation now planned to start early next year.

Research Organization:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC52-06NA25396
OSTI ID:
1248140
Report Number(s):
LA-UR-15-29108-03
Country of Publication:
United States
Language:
English

Similar Records

Experiment 2078C. Second Preliminary Reservoir Flow Test
Technical Report · Fri Jan 31 00:00:00 EST 1992 · OSTI ID:1248140

Recent flow testing of the HDR reservoir at Fenton Hill, NM
Conference · Fri Jan 01 00:00:00 EST 1993 · OSTI ID:1248140

Progress report on the long-term flow testing of the HDR reservoir at Fenton Hill, New Mexico
Conference · Thu Jan 28 00:00:00 EST 1993 · OSTI ID:1248140

Related Subjects