Title: Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems

Abstract

Experiment 2078 is planned as the initial phase of the Long-Term Flow Test. As such, it represents the "shakedown cruise" for the entire flowing system in its present configuration -- both the reservoir and the integrated surface plant. Since the Phase II reservoir has been continuously pressurized for the past 2-1/2 years at a mean pressure of about 15 MPa (2180 psi), it is essential to re-establish the relationships between surface injection and production pressures, and the resulting production flow rates. These relationships are needed before proceeding to the first -- aseismic -- phase of steady-state reservoir operation now planned to start early next year.

Authors:
 [1];  [1]
  1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
Publication Date:
Research Org.:
Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)
Sponsoring Org.:
USDOE
OSTI Identifier:
1248140
Report Number(s):
LA-UR-15-29108-03
DOE Contract Number:  
AC52-06NA25396
Resource Type:
Technical Report
Country of Publication:
United States
Language:
English
Subject:
02 PETROLEUM; Energy Sciences

Citation Formats

Brown, Donald W., and Robinson, Bruce A. Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems. United States: N. p., 1991. Web. doi:10.2172/1248140.
Brown, Donald W., & Robinson, Bruce A. Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems. United States. https://doi.org/10.2172/1248140
Brown, Donald W., and Robinson, Bruce A. 1991. "Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems". United States. https://doi.org/10.2172/1248140. https://www.osti.gov/servlets/purl/1248140.
@article{osti_1248140,
title = {Experiment 2078: The Initial Phase of the LTFT – Preliminary Flow Testing of the Phase II Reservoir -- and a Complete Checkout of the New Surface Plant, and the Integrated Digital Control and Data Acquisition Systems},
author = {Brown, Donald W. and Robinson, Bruce A.},
abstractNote = {Experiment 2078 is planned as the initial phase of the Long-Term Flow Test. As such, it represents the "shakedown cruise" for the entire flowing system in its present configuration -- both the reservoir and the integrated surface plant. Since the Phase II reservoir has been continuously pressurized for the past 2-1/2 years at a mean pressure of about 15 MPa (2180 psi), it is essential to re-establish the relationships between surface injection and production pressures, and the resulting production flow rates. These relationships are needed before proceeding to the first -- aseismic -- phase of steady-state reservoir operation now planned to start early next year.},
doi = {10.2172/1248140},
url = {https://www.osti.gov/biblio/1248140}, journal = {},
number = ,
volume = ,
place = {United States},
year = {Wed Sep 18 00:00:00 EDT 1991},
month = {Wed Sep 18 00:00:00 EDT 1991}
}