The ATLAS level 2 trigger supervisor.
Conference
·
OSTI ID:12350
This paper presents an overview of the hardware and software proposed for the ATLAS level 2 Trigger ROI Builder/Supervisor. The essential requirements of this system are that it operate at the design Level 1 Trigger rate of 100kHz and that it support the technical requirements of the architectures suggested for the ATLAS Level 2 Trigger. Commercial equipment and software support are used to the maximum extent possible, with support from dedicated hardware. Timing requirements and latencies are discussed and simulation results are presented.
- Research Organization:
- Argonne National Lab., IL (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 12350
- Report Number(s):
- ANL-HEP-CP-96-82
- Country of Publication:
- United States
- Language:
- English
Similar Records
A prototype ROI builder for the second level trigger of ATLAS implemented in FPGA's.
Partitions and trigger supervision in ALEPH
Operation and performance of an ATM based demonstrator for the sequential option of the ATLAS trigger
Conference
·
Mon Dec 06 23:00:00 EST 1999
·
OSTI ID:750616
Partitions and trigger supervision in ALEPH
Conference
·
Sun Oct 01 00:00:00 EDT 1989
· IEEE (Institute of Electrical and Electronics Engineers) Transactions on Nuclear Science; (USA)
·
OSTI ID:5412291
Operation and performance of an ATM based demonstrator for the sequential option of the ATLAS trigger
Journal Article
·
Sat Aug 01 00:00:00 EDT 1998
· IEEE Transactions on Nuclear Science
·
OSTI ID:665242