Rocky Mountain Arsenal, offpost contamination assessment, technical plan a003 (revision a)
Technical Report
·
OSTI ID:118022
The objectives of the off-post contamination assessment are to determine: (1) Existence and/or extent of contamination migration; and (2) effects of such contamination on the human environment. This technical plan describes the procedures, equipment, and rationale for the following work elements: (1) Geotechnical data collection and evaluation; (2) surface and ground water sampling; (3) chemical analysis; (4) data analysis; (5) contamination assessment; and (6) document preparation. Ground water monitoring is the major task under this plan of study, and the key element of the technical plan will be to detail procedures for establishing and operating the ground water network.
- Research Organization:
- Environmental Science and Engineering, Inc., Denver, CO (United States)
- OSTI ID:
- 118022
- Report Number(s):
- AD-A--289923/5/XAB; CNN: Contract DAAK11-83-D-0007
- Country of Publication:
- United States
- Language:
- English
Similar Records
Onpost/offpost ground/surface water monitoring program. Final report
Rocky Mountain Arsenal modeling. Final report
Comprehensive survey plan for soils and groundwater contamination at Rocky Mountain Arsenal, Colorado
Technical Report
·
Sat Oct 31 23:00:00 EST 1987
·
OSTI ID:273180
Rocky Mountain Arsenal modeling. Final report
Technical Report
·
Wed Sep 01 00:00:00 EDT 1982
·
OSTI ID:5367756
Comprehensive survey plan for soils and groundwater contamination at Rocky Mountain Arsenal, Colorado
Technical Report
·
Wed Sep 15 00:00:00 EDT 1976
·
OSTI ID:104198