Rocky Mountain Arsenal modeling. Final report
Technical Report
·
OSTI ID:5367756
To provide a quantitative analysis tool, a ground water flow and contaminant transport model was selected. This model provides the method to assess the local, arsenal-wide, and off-post impact of scheme designed to control ground water contaminant movement. Objectives of the modeling effort are: (1) To determine impacts of proposed changes in surface water management, (2) To compare the impacts of contaminant control at the source control at the arsenal boundaries. (3) To compare proposed control schemes with systems presently in place, (4) To determine the impact of closing Basin F, (5) To examine the effects of proposed control strategies on off-post migration of contaminants and water levels.
- Research Organization:
- ERTEC, Inc., Long Beach, CA (United States)
- OSTI ID:
- 5367756
- Report Number(s):
- AD-A-956509/4/XAB; CNN: DAAG29-81-D-0100
- Country of Publication:
- United States
- Language:
- English
Similar Records
Investigation of the northwest area of Rocky Mountain Arsenal
Digital model study of groundwater contamination by diisopropylmethylphosphonate (DIMP), Rocky Mountain Arsenal near Denver, Colorado. Final report
Installation restoration of Rocky Mountain Arsenal, pilot containment operations, final environmental impact statement, part 1
Technical Report
·
Tue Oct 31 23:00:00 EST 1978
·
OSTI ID:91511
Digital model study of groundwater contamination by diisopropylmethylphosphonate (DIMP), Rocky Mountain Arsenal near Denver, Colorado. Final report
Technical Report
·
Wed Jun 01 00:00:00 EDT 1977
·
OSTI ID:5474931
Installation restoration of Rocky Mountain Arsenal, pilot containment operations, final environmental impact statement, part 1
Technical Report
·
Mon Jan 31 23:00:00 EST 1977
·
OSTI ID:107907