Coal-fired high performance power generating system. Draft quarterly progress report, January 1--March 31, 1995
This report covers work carried out under Task 3, Preliminary R and D, under contract DE-AC22-92PC91155, ``Engineering Development of a Coal-Fired High Performance Power Generation System`` between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) by the year 2000 that is capable of >47% thermal efficiency; NO{sub x}, SO{sub x} and particulates {le} 25% NSPS; cost {ge}65% of heat input; all solid wastes benign. A crucial aspect of the authors design is the integration of the gas turbine requirements with the HITAF output and steam cycle requirements. In order to take full advantage of modern highly efficient aeroderivative gas turbines they have carried out a large number of cycle calculations to optimize their commercial plant designs for both greenfield and repowering applications.
- Research Organization:
- United Technologies Research Center, East Hartford, CT (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-92PC91155
- OSTI ID:
- 113953
- Report Number(s):
- DOE/PC/91155--T11; ON: DE96000931
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal-fired high performance power generating system. Quarterly progress report, April 1--June 30, 1993
Coal-fired high performance power generating system. Quarterly progress report, July 1, 1993--September 30, 1993
Coal-fired high performance power generating system. Quarterly progress report, January 1--March 31, 1992
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:10104235
Coal-fired high performance power generating system. Quarterly progress report, July 1, 1993--September 30, 1993
Technical Report
·
Thu Dec 30 23:00:00 EST 1993
·
OSTI ID:10135382
Coal-fired high performance power generating system. Quarterly progress report, January 1--March 31, 1992
Technical Report
·
Wed Dec 30 23:00:00 EST 1992
·
OSTI ID:10180875