Coal-fired high performance power generating system. Quarterly progress report, January 1--March 31, 1992
This report covers work carried out under Task 2, Concept Definition and Analysis, and Task 3, Preliminary R and D, under contract DE-AC22-92PC91155, ``Engineering Development of a Coal Fired High Performance Power Generation System`` between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) by the year 2000 that is capable of: > 47% thermal efficiency; NO{sub x}, SO{sub x} and Particulates {le} 25% NSPS; cost {ge} 65% of heat input; and all solid wastes benign. In order to achieve these goals our team has outlined a research plan based on an optimized analysis of a 250 MW{sub e} combined cycle system applicable to both frame type and aeroderivative gas turbines. Under the constraints of the cycle analysis we have designed a high temperature advanced furnace (FHTAF) which integrates several combustor and air heater designs with appropriate ash management procedures. The cycle optimization effort has brought about several revisions to the system configuration resulting from: (1) the use of Illinois No. 6 coal instead of Utah Blind Canyon; (2) the use of coal rather than methane as a reburn fuel; (3) reducing radiant section outlet temperatures to 1700F (down from 1800F); and (4) the need to use higher performance (higher cost) steam cycles to offset losses introduced as more realistic operating and construction constraints are identified.
- Research Organization:
- United Technologies Research Center, East Hartford, CT (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-92PC91155
- OSTI ID:
- 10180875
- Report Number(s):
- DOE/PC/91155--T3; ON: DE93041231
- Country of Publication:
- United States
- Language:
- English
Similar Records
Coal-fired high performance power generating system. Draft quarterly progress report, January 1--March 31, 1995
Coal-fired high performance power generating system. Quarterly progress report, April 1--June 30, 1993
Coal-fired high performance power generating system. Quarterly progress report, July 1, 1993--September 30, 1993
Technical Report
·
Sun Oct 01 00:00:00 EDT 1995
·
OSTI ID:113953
Coal-fired high performance power generating system. Quarterly progress report, April 1--June 30, 1993
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:10104235
Coal-fired high performance power generating system. Quarterly progress report, July 1, 1993--September 30, 1993
Technical Report
·
Thu Dec 30 23:00:00 EST 1993
·
OSTI ID:10135382
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200102
AIR HEATERS
AIR POLLUTION ABATEMENT
BURNERS
COMBINED-CYCLE POWER PLANTS
COST
FLAMES
GAS TURBINES
INTERACTIONS
NITROGEN OXIDES
OPTIMIZATION
PARTICULATES
POWER CYCLES
POWER GENERATION
PROGRESS REPORT
REFRACTORIES
SLAGS
STAGED COMBUSTION
STEAM TURBINES
SULFUR DIOXIDE
THERMAL EFFICIENCY
200102
AIR HEATERS
AIR POLLUTION ABATEMENT
BURNERS
COMBINED-CYCLE POWER PLANTS
COST
FLAMES
GAS TURBINES
INTERACTIONS
NITROGEN OXIDES
OPTIMIZATION
PARTICULATES
POWER CYCLES
POWER GENERATION
PROGRESS REPORT
REFRACTORIES
SLAGS
STAGED COMBUSTION
STEAM TURBINES
SULFUR DIOXIDE
THERMAL EFFICIENCY