Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 5: Design validation assessments and lists
The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. The following Code Evaluation analyzes the applicable sections of the National Fire Protection Association (NFPA) 101, Life Safety Code, 1994 Edition and the 1994 Edition of the Uniform Building Code (UBC) to the W113 Trench Enclosure. A Building Code Analysis generally establishes four primary design criteria: occupancy classification; separation requirements; egress requirements; and construction type. The UBC establishes requirements for all criteria. This analysis is limited to the Trench Enclosure Building. The General Office Building and the Retrieval Staff Change Building is not within the scope of this analysis.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States); Raytheon Engineers and Constructors, Inc., Philadelphia, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 113883
- Report Number(s):
- WHC-SD-W113-FDR-001-Vol.5; ON: TI96000774; CNN: Contract MJJ-SVV-364162; TRN: 95:022211
- Resource Relation:
- Other Information: PBD: Sep 1995
- Country of Publication:
- United States
- Language:
- English
Similar Records
Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications
Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 1: Title II design report
Related Subjects
HANFORD RESERVATION
RADIOACTIVE WASTE FACILITIES
BUILDING CODES
DESIGN
STORAGE FACILITIES
WASTE RETRIEVAL
REMEDIAL ACTION
RADIOACTIVE WASTES
SAFETY ENGINEERING
OCCUPANTS
FIRE PREVENTION
COMPLIANCE
RADIATION DOSES
BIOLOGICAL SHIELDS
HUMAN FACTORS
MATERIALS HANDLING
DECONTAMINATION
COMPILED DATA