Title: Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications

Abstract

The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specifymore » the equipment overall design parameters.« less

Publication Date:
Research Org.:
Westinghouse Hanford Co., Richland, WA (United States); Raytheon Engineers and Constructors, Inc., Philadelphia, PA (United States)
Sponsoring Org.:
USDOE, Washington, DC (United States)
OSTI Identifier:
113881
Report Number(s):
WHC-SD-W113-FDR-001-Vol.3
ON: DE96000772; CNN: Contract MJJ-SVV-364162; TRN: 95:022209
DOE Contract Number:  
AC06-87RL10930
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: Sep 1995
Country of Publication:
United States
Language:
English
Subject:
05 NUCLEAR FUELS; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES; SPECIFICATIONS; STORAGE FACILITIES; WASTE RETRIEVAL; REMEDIAL ACTION; RADIOACTIVE WASTES; BUILDING MATERIALS; MATERIALS HANDLING EQUIPMENT; DATA ACQUISITION SYSTEMS; RADIATION MONITORS; CONTAINERS; SHIELDS; IDENTIFICATION SYSTEMS; CONTROL EQUIPMENT; VENTILATION SYSTEMS; ELECTRICAL EQUIPMENT; POWER SUPPLIES; FIRE PREVENTION

Citation Formats

. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications. United States: N. p., 1995. Web. doi:10.2172/113881.
. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications. United States. https://doi.org/10.2172/113881
. Fri . "Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications". United States. https://doi.org/10.2172/113881. https://www.osti.gov/servlets/purl/113881.
@article{osti_113881,
title = {Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 3: Specifications},
author = {},
abstractNote = {The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. Volume 3 is a compilation of the construction specifications that will constitute the Title II materials and performance specifications. This volume contains CSI specifications for non-equipment related construction material type items, performance type items, and facility mechanical equipment items. Data sheets are provided, as necessary, which specify the equipment overall design parameters.},
doi = {10.2172/113881},
url = {https://www.osti.gov/biblio/113881}, journal = {},
number = ,
volume = ,
place = {United States},
year = {1995},
month = {9}
}