Aging of Weapon Seals – An Update on Butyl O-ring Issues

S&T Accomplishment Report ·
DOI:https://doi.org/10.2172/1130326· OSTI ID:1130326
During testing under the Enhanced Surveillance Campaign in 2001, preliminary data detected a previously unknown and potentially serious concern with recently procured butyl o-rings on several programs. All butyl o-rings molded from a proprietary formulation throughout the period circa 1999 through 2001 had less than a full cure. Engineering judgment was that under curing is detrimental and could possibly lead to sub-optimum performance or, in the worst case, premature seal failure. An aging study was undertaken to ensure that suspect o-rings installed in the stockpile will retain sufficient sealing force for a minimum ten-year service life. A new prediction model developed for this study indicates suspect o-rings do not need to be replaced before the ten-year service life. Long-term testing results are reported on a yearly basis to validate the prediction model. This report documents the aging results for the period September 2002 to January 2011.
Research Organization:
Kansas City Plant (KCP), Kansas City, MO (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
OSTI ID:
1130326
Report Number(s):
KCP-613-8931
Country of Publication:
United States
Language:
English

Similar Records

Room Temperature Aging Study of Butyl O-rings
Conference · Fri Aug 07 00:00:00 EDT 2009 · OSTI ID:972916

Report on Internship Project: Risk-Informed Cost Reduction in Nuclear Power Plants
S&T Accomplishment Report · Sun Aug 19 20:00:00 EDT 2018 · OSTI ID:1967351

ESP – Data from Restarted Life Tests of Various Silicon Materials
S&T Accomplishment Report · Wed Oct 06 00:00:00 EDT 2010 · OSTI ID:1129928