Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Contingency contractor optimization.

Technical Report ·
DOI:https://doi.org/10.2172/1104778· OSTI ID:1104778

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Research Organization:
Sandia National Laboratories (SNL-NM), Albuquerque, NM (United States); Cornell University,,
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1104778
Report Number(s):
SAND2013-8788; 477135
Country of Publication:
United States
Language:
English

Related Subjects