Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Contingency Contractor Optimization: Phase 3, Model Description and Formulation

Technical Report ·
DOI:https://doi.org/10.2172/1090228· OSTI ID:1090228

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Research Organization:
Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)
Sponsoring Organization:
USDOE National Nuclear Security Administration (NNSA)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
1090228
Report Number(s):
SAND--2013-5506; 460317
Country of Publication:
United States
Language:
English

Similar Records

Contingency contractor optimization.
Technical Report · Tue Oct 01 00:00:00 EDT 2013 · OSTI ID:1104778

Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype
Technical Report · Sun May 01 00:00:00 EDT 2016 · OSTI ID:1257619

Contingency Contractor Optimization Phase 3 Quick Start Guide Contingency Contractor Optimization Tool Prototype - Release 2.2
Technical Report · Wed Apr 01 00:00:00 EDT 2015 · OSTI ID:1494620

Related Subjects