Development of Beam Instrumentation for CLIC at the CTF3
- Northwestern Univ., Evanston, IL (United States); Northwestern University
This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.
- Research Organization:
- Northwestern Univ., Evanston, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- Contributing Organization:
- Northwestern University
- DOE Contract Number:
- FG02-05ER41397
- OSTI ID:
- 1098050
- Report Number(s):
- DOE-NORTHWESTERN--41397; CNV0041710; 60012623
- Country of Publication:
- United States
- Language:
- English
Similar Records
An Injector for the CLIC Test Facility (CTF3)
Experimental Studies on Drive Beam Generation in CTF3
First Full Beam Loading Operation with the CTF3 Linac
Technical Report
·
Mon Jan 22 23:00:00 EST 2001
·
OSTI ID:784848
Experimental Studies on Drive Beam Generation in CTF3
Conference
·
Tue Jul 01 00:00:00 EDT 2008
·
OSTI ID:956013
First Full Beam Loading Operation with the CTF3 Linac
Technical Report
·
Thu Sep 23 00:00:00 EDT 2004
·
OSTI ID:833095