D-Zero Collider Detector Cryopump Design and Operation

Technical Report ·
DOI:https://doi.org/10.2172/1031807· OSTI ID:1031807
The vacuum pumping of the CC Cryostat was anticipated to be dominated by a water vapor load. The Engineering Note 270, extrapolating from earlier experience, predicts the removal of water vapor will be the dominant pumping load and take ca. 45 days to remove at the pumping speed planned. Part of the planned pumping capability was a homemade, liquid nitrogen temperature, water vapor cryopump. This note describes the design, fabrication and performance experiences of the Cryopump described in the D0 assembly drawing 3740.514-ME-294693.
Research Organization:
Fermi National Accelerator Laboratory (FNAL), Batavia, IL
Sponsoring Organization:
DOE Office of Science
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1031807
Report Number(s):
FERMILAB-D0-EN-291
Country of Publication:
United States
Language:
English

Similar Records

D-Zero Collider Detector CC Initial Vacuum Pumping Preparation and Procedure
Technical Report · Mon Apr 08 00:00:00 EDT 1991 · OSTI ID:1031808

D-Zero Central Calorimeter Inner Vessel Pumpdown Information
Technical Report · Sun Dec 09 23:00:00 EST 1990 · OSTI ID:1031824

D-Zero Collider Detector CC Cooldown/Fill and Overview
Technical Report · Tue Jan 30 23:00:00 EST 1990 · OSTI ID:1031816