skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: D-Zero Cryostat Supplemental Rupture Disc

Technical Report ·
DOI:https://doi.org/10.2172/1030718· OSTI ID:1030718

The common relief and rupture disc vent line requires a double disc assembly with vented interspace for accurate disc burst pressures. The first disc must take pump and purge vacuum loading, but be set to operate at 110% of the MAWP, 18.3 psig (ASME code). The available solution is 18.3 psig with a burst tolerance of +/- psig. The interspace should be locally vented by a flow limiting vent valve to decouple the vent line backpressure from the vessel rupture disc. The second disc must take the worst case vent line backpressure, the steady state value found in D-Zero engineering note 3740.000-EN-63 with all three cryostats simultaneously venting at the fire condition into the 4-inch x 6-inch and 6-inch x 8-inch sections. This value is less than 2 psid. The maximum rupture value for the second disc must be less than the minimum rupture value for the first disc less 2 psid i.e. < 16.3.

Research Organization:
Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States)
Sponsoring Organization:
USDOE Office of Science (SC)
DOE Contract Number:
AC02-07CH11359
OSTI ID:
1030718
Report Number(s):
FERMILAB-D0-EN-101; TRN: US201201%%367
Country of Publication:
United States
Language:
English

Similar Records

REACTOR REFUELING - INTERIM DECAY STORAGE (FFTF)
Technical Report · Mon Jun 18 00:00:00 EDT 1990 · OSTI ID:1030718

Status of prototype rupture disc testing in the large leak test rig
Technical Report · Sat Sep 01 00:00:00 EDT 1979 · OSTI ID:1030718

D-0 North End Cap Calorimeter Cold Test Results
Technical Report · Thu Aug 02 00:00:00 EDT 1990 · OSTI ID:1030718