Title: Status of prototype rupture disc testing in the large leak test rig

Technical Report ·
DOI:https://doi.org/10.2172/6404663· OSTI ID:6404663

The prototype CRBRP double membrane rupture disc assembly is being performance tested in conjunction with the LLTR Series II Large Leak Program. In May 1979, the double membrane disc assembly was inadvertently activated during sodium system pressure instrument calibration. This experience indicated that the rupture disc burst at essentially the design burst pressure when a gradually increasing state pressure was applied. The area of membrane opening was found to be about 25 to 30% of the cross-sectional area. In July 1979, the disc assembly was again tested (this time in a single membrane configuration) in conjunction with the first LLTR Series II Test A-1a (inert gas injection). Test data indicated that the disc burst in about 35 ms at essentially the design burst pressure with an opening of about 30% of the cross-sectional area. The pressure immediately downstream of the disc dropped below atmospheric pressure following the rupture tube event (releasing high pressure nitrogen into sodium) for about 1.5 seconds before increasing to a maximum of 30 psig. This behavior raises a question on the adequacy of a downstream pressure device for rapid sensing of disc rupture and initiating plant shutdown following a large SWR event. 14 figures.

Research Organization:
General Electric Co., Sunnyvale, CA (USA). Advanced Reactor Systems Dept.
DOE Contract Number:
AT03-76SF70030
OSTI ID:
6404663
Report Number(s):
DOE/SF/70030-T18; ON: DE81025236; TRN: 81-012085
Country of Publication:
United States
Language:
English