skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Lattice Commissioning Stretgy Simulation for the B Factory

Conference · · Conf.Proc.C970512:2586,1997
OSTI ID:1023259

To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.

Research Organization:
SLAC National Accelerator Lab., Menlo Park, CA (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
AC02-76SF00515
OSTI ID:
1023259
Report Number(s):
SLAC-REPRINT-2011-016; TRN: US1104402
Journal Information:
Conf.Proc.C970512:2586,1997, Conference: 17th IEEE Particle Accelerator Conference (PAC 97): Accelerator Science, Technology and Applications, 12-16 May 1997, Vancouver, British Columbia, Canada
Country of Publication:
United States
Language:
English

Similar Records

Performance of the beam position monitor system for the SLAC PEP-II B factory
Journal Article · Thu Dec 10 00:00:00 EST 1998 · AIP Conference Proceedings · OSTI ID:1023259

Performance of the beam position monitor system for the SLAC PEP-II {ital B} factory
Journal Article · Tue Dec 01 00:00:00 EST 1998 · AIP Conference Proceedings · OSTI ID:1023259

Lattice commissioning strategy for the B-factory
Conference · Thu May 01 00:00:00 EDT 1997 · OSTI ID:1023259