To prepare for the PEP-II turn on, we have studied one commissioning strategy with simulated lattice errors. Features such as difference and absolute orbit analysis and correction are discussed. To prepare for the commissioning of the PEP-II injection line and high energy ring (HER), we have developed a system for on-line orbit analysis by merging two existing codes: LEGO and RESOLVE. With the LEGO-RESOLVE system, we can study the problem of finding quadrupole alignment and beam position (BPM) offset errors with simulated data. We have increased the speed and versatility of the orbit analysis process by using a command file written in a script language designed specifically for RESOLVE. In addition, we have interfaced the LEGO-RESOLVE system to the control system of the B-Factory. In this paper, we describe online analysis features of the LEGO-RESOLVE system and present examples of practical applications.
- Research Organization:
- SLAC National Accelerator Lab., Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC02-76SF00515
- OSTI ID:
- 1023259
- Report Number(s):
- SLAC-REPRINT-2011-016; TRN: US1104402
- Journal Information:
- Conf.Proc.C970512:2586,1997, Conference: 17th IEEE Particle Accelerator Conference (PAC 97): Accelerator Science, Technology and Applications, 12-16 May 1997, Vancouver, British Columbia, Canada
- Country of Publication:
- United States
- Language:
- English
Similar Records
Performance of the beam position monitor system for the SLAC PEP-II {ital B} factory
Lattice commissioning strategy for the B-factory