Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson. Commercial power reactors, Volume 7
Technical Report
·
OSTI ID:10191609
This report examines the reactor coolant pump (RCP) seal operating experience through August 1990 at plants with Byron Jackson (B-J) RCPs. ne operating experience examined in this analysis included a review of the practice of continuing operation with a degraded seal. Plants with B-J RCPs that have had relatively good experience with their RCP seals attribute this success to a combination of different factors, including: enhanced seal QA efforts, modified/new seal designs, improved maintenance procedures and training, attention to detail, improved seal operating procedures, knowledgeable personnel involved in seal maintenance and operation, reduction in frequency of transients that stress the seals, seal handling and installation equipment designed to the appropriate precision, and maintenance of a clean seal cooling water system. As more plants have implemented corrective measures such as these, the number of B-J RCP seal failures experienced has tended to decrease. This study included a review of the practice of continued operation with a degraded seal in the case of PWR plants with Byron Jackson reactor coolant pumps. Specific factors were identified which should be addressed in order to safety manage operation of a reactor coolant pump with indications of a degrading seal.
- Research Organization:
- Nuclear Regulatory Commission, Washington, DC (United States). Div. of Safety Programs
- Sponsoring Organization:
- Nuclear Regulatory Commission, Washington, DC (United States)
- OSTI ID:
- 10191609
- Report Number(s):
- NUREG--1275-Vol.7; ON: TI93002815
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operating experience feedback report: Experience with pump seals installed in reactor coolant pumps manufactured by Byron Jackson
Reactor-coolant-pump-seal improvement
Development of a reactor coolant pump monitoring and diagnostic system. Progress report, June 1982-July 1983
Technical Report
·
Tue Sep 01 00:00:00 EDT 1992
·
OSTI ID:6935534
Reactor-coolant-pump-seal improvement
Technical Report
·
Sat May 01 00:00:00 EDT 1982
·
OSTI ID:5239450
Development of a reactor coolant pump monitoring and diagnostic system. Progress report, June 1982-July 1983
Technical Report
·
Wed Nov 30 23:00:00 EST 1983
·
OSTI ID:5227904