Development of a reactor coolant pump monitoring and diagnostic system. Progress report, June 1982-July 1983

Technical Report ·
OSTI ID:5227904
The quality of operating data has been insufficient to allow proper evaluation of theoretical reactor coolant (RC) pump seal failure mechanisms. The RC pump monitoring and diagnostic system being developed and installed at Toledo Edison's Davis-Besse Nuclear Power Station will examine the relationship between seal failures and three other variables: The rotordynamic behavior of the pump shaft and related components, the internal conditions and performance of the seals, and the plant or pump operating environment (controlled by the plant operator). Interrelationships between these areas will be developed during the data collection task, scheduled to begin in October 1983 (for a full fuel cycle at Davis-Besse). This report describes system software and hardware development, testing, and installation work performed during this period. Also described is a parallel effort being conducted by a B and W/Byron Jackson/Utility group to improve pump seal performance.
Research Organization:
Toledo Edison Co., OH (USA); Babcock and Wilcox Co., Lynchburg, VA (USA)
DOE Contract Number:
AC02-79ET34019
OSTI ID:
5227904
Report Number(s):
DOE/ET/34019-3; BAW-1806; ON: DE84010228