A comparison of real-time radiography results and visual characterization results with emphasis on WIPP WAC and TRAMPAC compliance issues
Conference
·
OSTI ID:10191158
Visual characterization provides a means of confirming the real-time radiography (RTR) certification process and process knowledge. RTR and visual characterization have been conducted on thirty-three drums containing transuranic (TRU) waste in support of the Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP) at the Idaho National Engineering Laboratory. Argonne National Laboratory - West (ANL-W) detected a small can of liquid in one of these drums during the visual examination, resulting in a WIPP Waste Acceptance Criteria (WIPP-WAC) miscertification. The remaining thirty-two drums were certified correctly by the RTR system at the Stored Waste Examination Pilot Plant (SWEPP) for WIPP-WAC and TRUPACT-II Authorized Methods for Payload Control (TRAMPAC) requirements. TRAMPAC contains restrictions on the weights of specific materials allowed in the waste, based on the shipping category. Items on the restricted list for a given shipping category are allowed in quantities less than 1 percent of the weight of the waste. RTR can estimate the weights of certain broad categories in homogeneous waste forms, however, the capability to estimate weights at the 1 percent level is not presently realistic. Process knowledge forms the basis of conformance to these weight requirements. Visual characterization suggests process knowledge is not completely adequate at this level.
- Research Organization:
- Idaho National Engineering Lab., Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 10191158
- Report Number(s):
- EGG-M--94237; CONF-940216--6; ON: DE95001902
- Country of Publication:
- United States
- Language:
- English
Similar Records
WIPP characterization data requirements and the development of the WIPP waste characterization database
Use of acceptable knowledge to demonstrate TRAMPAC compliance
TRU partnership - Phased approach: Accomplishing site objectives while supporting the WIPP-WAC
Technical Report
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:111752
Use of acceptable knowledge to demonstrate TRAMPAC compliance
Conference
·
Wed Dec 31 23:00:00 EST 2003
·
OSTI ID:977489
TRU partnership - Phased approach: Accomplishing site objectives while supporting the WIPP-WAC
Technical Report
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:111740