Advanced reactors transition fiscal year 1995 multi-year program plan WBS 7.3
This document describes in detail the work to be accomplished in FY-1995 and the out years for the Advanced Reactors Transition (WBS 7.3). This document describes specific milestones and funding profiles. Based upon the Fiscal Year 1995 Multi-Year Program Plan, DOE will provide authorization to perform the work outlined in the FY 1995 MYPP. Following direction given by the US Department of Energy (DOE) on December 15, 1993, Advanced Reactors Transition (ART), previously known as Advanced Reactors, will provide the planning and perform the necessary activities for placing the Fast Flux Test Facility (FFTF) in a radiologically and industrially safe shutdown condition. The DOE goal is to accomplish the shutdown in approximately five years. The Advanced Reactors Transition Multi-Year Program Plan, and the supporting documents; i.e., the FFTF Shutdown Program Plan and the FFTF Shutdown Project Resource Loaded Schedule (RLS), are defined for the life of the Program. During the transition period to achieve the Shutdown end-state, the facilities and systems will continue to be maintained in a safe and environmentally sound condition. Additionally, facilities that were associated with the Office of Nuclear Energy (NE) Programs, and are no longer required to support the Liquid Metal Reactor Program will be deactivated and transferred to an alternate sponsor or the Decontamination and Decommissioning (D and D) Program for final disposition, as appropriate.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 10189603
- Report Number(s):
- WHC-SD-FF-SSP--052; ON: DE95001565; BR: 35AF11201/35AF11202
- Country of Publication:
- United States
- Language:
- English
Similar Records
Advanced reactors transition fiscal year 1996 multi-year program plan WBS 7.3
Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)
Advanced reactors transition FY 1997 multi-year work plan WBS 7.3
Technical Report
·
Thu Sep 21 00:00:00 EDT 1995
·
OSTI ID:266364
Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)
Technical Report
·
Thu Sep 01 00:00:00 EDT 1994
·
OSTI ID:10188613
Advanced reactors transition FY 1997 multi-year work plan WBS 7.3
Technical Report
·
Fri Sep 27 00:00:00 EDT 1996
·
OSTI ID:328472
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210500
22 GENERAL STUDIES OF NUCLEAR REACTORS
220600
AUXILIARY SYSTEMS
DRAINAGE
FFTF REACTOR
FINANCING
PLANNING
POWER REACTORS
BREEDING
REACTOR FUELING
REACTOR MAINTENANCE
REACTOR SHUTDOWN
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
SAFETY
SCHEDULES
SPENT FUEL STORAGE
210500
22 GENERAL STUDIES OF NUCLEAR REACTORS
220600
AUXILIARY SYSTEMS
DRAINAGE
FFTF REACTOR
FINANCING
PLANNING
POWER REACTORS
BREEDING
REACTOR FUELING
REACTOR MAINTENANCE
REACTOR SHUTDOWN
RESEARCH
TEST
TRAINING
PRODUCTION
IRRADIATION
MATERIALS TESTING REACTORS
SAFETY
SCHEDULES
SPENT FUEL STORAGE