skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Double shell tanks emergency pumping plan

Technical Report ·
DOI:https://doi.org/10.2172/10189141· OSTI ID:10189141

At the request of the Department of Energy (DOE), a formal plan for the emergency transfer of waste from a leaking double shell tank to a designated receiver tank has been developed. This plan is in response to the priority 2 safety issue ``Response to a leaking double-shell tank`` in the DOE Report to Congress, 1991. The plan includes the tanks in four of the east tank farms and one of the west farms. The background information and supporting calculations used for the creation of the emergency plan are discussed in this document. The scope of this document is all of the double shell tanks in the AN, AP, AW, AY, and SY farms. The transfer lines, flush pits, and valve pits involved in the transfer of waste between these farms are also included in the scope. Due to the storage of high heat waste, AZ farm is excluded at this time.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
10189141
Report Number(s):
WHC-SD-WM-AP-031; ON: DE95001376; BR: 35AF11201/35AF11202; TRN: AHC29501%%44
Resource Relation:
Other Information: PBD: 26 Sep 1994
Country of Publication:
United States
Language:
English