Functional design criteria, Project W-211, Initial Tank Retrieval Systems. Revision 1
This document provides the technical baseline for retrieval of waste from ten double-shell tanks in the SY, AN, AP, AW, AY, and AZ tank farms. In order to retrieve waste from these tanks, systems are needed to mix the sludge with the supernate and pump the waste mixture from the tank. For 101-SY, the existing mitigation pump will be used to mix the waste and Project W-211 will provide for waste removal. The retrieval scope for the other nine tanks includes both the waste mixing and removal functions.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 65029
- Report Number(s):
- WHC-SD-W211-FDC--001-Rev.1; ON: DE95007197
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan
Functional design criteria: Tank 101-AZ waste retrieval system. Revision 3
Title I design summary report, initial tank retrieval systems, project W-211
Technical Report
·
Tue Aug 24 00:00:00 EDT 1999
·
OSTI ID:797725
Functional design criteria: Tank 101-AZ waste retrieval system. Revision 3
Technical Report
·
Sat Jul 01 00:00:00 EDT 1995
·
OSTI ID:408677
Title I design summary report, initial tank retrieval systems, project W-211
Technical Report
·
Tue Feb 28 23:00:00 EST 1995
·
OSTI ID:50983