Increased production study B, D, DR, F, H and C reactors
This document studies a broad study program which is currently in progress in Irradiation Processing Department to evaluate the technical and economic feasibility of various methods of obtaining increased production from the six older reactors (B, D, DR, F, H, and C Reactors). Due to time limitations this study has been in general terms only, but has indicated that considerable increased plant return can be obtained from an increased conversion ratio as well as from higher reactor power levels. The work performed by this Unit has been concerned with defining the reactor process component modifications, and process piping changes between the 105 Building valve pits and effluent basins which will be required to attain the production increases.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10186005
- Report Number(s):
- HW--63351; ON: DE93000333
- Country of Publication:
- United States
- Language:
- English
Similar Records
Piping Changes for Increased Production at B, D, DR, F, C and H Reactors calculations
Piping changes for increased production at B, D, DR, F, C, and H reactors
Water plant modifications for increased production at B, C, D, DR, F, and H Reactors
Technical Report
·
Wed Mar 23 23:00:00 EST 1960
·
OSTI ID:10162047
Piping changes for increased production at B, D, DR, F, C, and H reactors
Technical Report
·
Thu Jan 21 23:00:00 EST 1960
·
OSTI ID:10103842
Water plant modifications for increased production at B, C, D, DR, F, and H Reactors
Technical Report
·
Thu Apr 14 23:00:00 EST 1960
·
OSTI ID:10156399