Development & testing of industrial scale, coal fired combustion system, Phase 3. Ninth quarterly technical progress report, 1 January 1994--31 March 1994
Technical Report
·
OSTI ID:10184965
The primary objective of the present Phase 3 effort is to perform the final testing, at a 20 MMBtu/hr commercial scale, of an air cooled, slagging coal combustor for application to industrial steam boilers and power plants. The focus of the test effort is on combustor durability, automatic control of the combustor`s operation, and optimum environmental control of emissions inside the combustor. The primary effort is the first quarter of calendar year 1994 was devoted to the Task 5, Site Demonstration effort. The work consisted of disassembly of the combustor and auxiliary systems at the Williamsport test site, which was being closed by the site owner. All the equipment was removed and stored temporarily pending its relocation to the demonstration test site. Also in the first quarter, an extensive effort was implemented to locate a suitable site for the Task 5 combustor relocation. In addition, an intense effort was implemented to identify other industrial steam and power users in Southeast Pennsylvania as an alternate site. Another major focus was the design of the extension to the combustor and a new exit nozzle. These efforts are described in this report.
- Research Organization:
- Coal Tech Corp., Merion Station, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-91PC91162
- OSTI ID:
- 10184965
- Report Number(s):
- DOE/PC/91162--T10; ON: DE95000361; BR: AA3520100
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development and testing of industrial scale, coal fired combustion system: Phase 3, Progress report, July 1, 1995--September 30, 1995
Development and testing of industrial scale, coal fired combustion system, Phase 3. Sixteenth quarterly technical progress report, October 1--December 31, 1995
Development and testing of industrial scale, coal fired combustion system, Phase 3. Eighteenth quarterly technical progress report, April 1, 1996--June 30, 1996
Technical Report
·
Thu Oct 12 00:00:00 EDT 1995
·
OSTI ID:227698
Development and testing of industrial scale, coal fired combustion system, Phase 3. Sixteenth quarterly technical progress report, October 1--December 31, 1995
Technical Report
·
Tue Jan 02 23:00:00 EST 1996
·
OSTI ID:257340
Development and testing of industrial scale, coal fired combustion system, Phase 3. Eighteenth quarterly technical progress report, April 1, 1996--June 30, 1996
Technical Report
·
Sun Aug 18 00:00:00 EDT 1996
·
OSTI ID:415803
Related Subjects
01 COAL, LIGNITE, AND PEAT
014000
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION
320303
AIR POLLUTION CONTROL
COAL PREPARATION
COMBUSTION
CYCLONE COMBUSTORS
DEMONSTRATION PLANTS
ECONOMICS
EQUIPMENT AND PROCESSES
FLY ASH
INDUSTRIAL PLANTS
MODIFICATIONS
NITROGEN OXIDES
ON-SITE POWER GENERATION
PERFORMANCE TESTING
PROGRESS REPORT
SITE SELECTION
SLAGS
SORBENT INJECTION PROCESSES
STEAM GENERATION
SULFUR DIOXIDE
014000
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION
320303
AIR POLLUTION CONTROL
COAL PREPARATION
COMBUSTION
CYCLONE COMBUSTORS
DEMONSTRATION PLANTS
ECONOMICS
EQUIPMENT AND PROCESSES
FLY ASH
INDUSTRIAL PLANTS
MODIFICATIONS
NITROGEN OXIDES
ON-SITE POWER GENERATION
PERFORMANCE TESTING
PROGRESS REPORT
SITE SELECTION
SLAGS
SORBENT INJECTION PROCESSES
STEAM GENERATION
SULFUR DIOXIDE