Development and testing of industrial scale, coal fired combustion system, Phase 3. Sixteenth quarterly technical progress report, October 1--December 31, 1995
In the fourth quarter of calendar year 1995 the installation and checkout of the 20 MMBtu/hr combustor and auxiliary equipment in Philadelphia was completed. The task 5, Site Demonstration Testing, combustor-boiler tests on gas, oil, and coal were initiated. The task 5 effort involves testing the combustor over extended periods under conditions that fully simulate commercial operation and that meet the combustion and environmental specifications for this project. To meet this project objective within the current work scope requires up to 500 hours of testing. The focus of this testing will be on the component and environmental performance of combustor, boiler, coal preparation and feeding, and the stack gas equipment. The facility can be converted to a 500 kW power plant by the addition of a steam turbine, condenser, and cooling tower. However, this added effort is beyond the current work scope and its implementation will depend on recovering the added costs by placing the steam production from the boiler to beneficial use. During the present quarterly reporting period, all the components needed to implement the initial 100 hours of testing under task 5 were installed at the test site, and checkout of this equipment was performed. Since the present installation contained substantial improvements and simplifications to all sub-systems that had been used in the Williamsport facility, each component and sub-system had to be tested individually.
- Research Organization:
- Coal Tech Corp., Merion Station, PA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC22-91PC91162
- OSTI ID:
- 257340
- Report Number(s):
- DOE/PC/91162--T16; ON: DE96012571
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development & testing of industrial scale, coal fired combustion system, phase 3. Fourteenth quarterly progress report, April 1, 1995--June 30, 1995
Development and testing of industrial scale, coal fired combustion system: Phase 3, Progress report, July 1, 1995--September 30, 1995
Development and Testing of Industrial Scale Coal Fired Combustion System, Phase 3
Technical Report
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:162164
Development and testing of industrial scale, coal fired combustion system: Phase 3, Progress report, July 1, 1995--September 30, 1995
Technical Report
·
Thu Oct 12 00:00:00 EDT 1995
·
OSTI ID:227698
Development and Testing of Industrial Scale Coal Fired Combustion System, Phase 3
Technical Report
·
Wed Sep 30 00:00:00 EDT 1998
·
OSTI ID:923036
Related Subjects
01 COAL, LIGNITE, AND PEAT
AUXILIARY SYSTEMS
BLOWERS
COAL
COAL PREPARATION PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DEASHING
DESIGN
FLUE GAS
FUEL FEEDING SYSTEMS
GAS BURNERS
PERFORMANCE TESTING
PNEUMATIC TRANSPORT
POLLUTION CONTROL EQUIPMENT
PROGRESS REPORT
PROPANE
PULVERIZERS
SORBENT INJECTION PROCESSES
AUXILIARY SYSTEMS
BLOWERS
COAL
COAL PREPARATION PLANTS
COMBUSTION
COMBUSTORS
CONTROL SYSTEMS
DEASHING
DESIGN
FLUE GAS
FUEL FEEDING SYSTEMS
GAS BURNERS
PERFORMANCE TESTING
PNEUMATIC TRANSPORT
POLLUTION CONTROL EQUIPMENT
PROGRESS REPORT
PROPANE
PULVERIZERS
SORBENT INJECTION PROCESSES