Helium pressures in RHIC vacuum cryostats and relief valve requirements from magnet cooling line failure
A catastrophic failure of the RHIC magnet cooling lines, similar to the LHC superconducting bus failure incident, would pressurize the insulating vacuum in the magnet and transfer line cryostats. Insufficient relief valves on the cryostats could cause a structural failure. A SINDA/FLUINT{reg_sign} model, which simulated the 4.5K/4 atm helium flowing through the magnet cooling system distribution lines, then through a line break into the vacuum cryostat and discharging via the reliefs into the RHIC tunnel, had been developed to calculate the helium pressure inside the cryostat. Arc flash energy deposition and heat load from the ambient temperature cryostat surfaces were included in the simulations. Three typical areas: the sextant arc, the Triplet/DX/D0 magnets, and the injection area, had been analyzed. Existing relief valve sizes were reviewed to make sure that the maximum stresses, caused by the calculated maximum pressures inside the cryostats, did not exceed the allowable stresses, based on the ASME Code B31.3 and ANSYS results. The conclusions are as follows: (1) The S/F simulation results show that the highest internal pressure in the cryostats, due to the magnet line failure, is {approx}37 psig (255115 Pa); (2) Based on the simulation, the temperature on the cryostat chamber, INJ Q8-Q9, could drop to 228 K, which is lower than the material minimum design temperature allowed by the Code; (3) Based on the ASME Code and ANSYS results, the reliefs on all the cryostats inside the RHIC tunnel are adequate to protect the vacuum chambers when the magnet cooling lines fail; and (4) In addition to the pressure loading, the thermal deformations, due to the temperature decrease on the cryostat chambers, could also cause a high stress on the chamber, if not properly supported.
- Research Organization:
- Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
- Sponsoring Organization:
- DOE - OFFICE OF SCIENCE
- DOE Contract Number:
- DE-AC02-98CH10886
- OSTI ID:
- 1018305
- Report Number(s):
- BNL-94073-2011-CP; R&D Project: KBCH139; 18036; KB0202011; TRN: US1103370
- Resource Relation:
- Conference: 2011 Particle Accelerator Conference (PAC'11); New York, NY; 20110328 through 20110401
- Country of Publication:
- United States
- Language:
- English
Similar Records
D-Zero End Cap Calorimeter Annular Piping Analysis
Failure investigation of a low chrome long-seam weld in a high-temperature refinery piping system