Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Alignment of CEBAF cryomodules

Conference ·
OSTI ID:10172768
CEBAF, the Continuous Electron Beam Accelerator Facility, when completed, will house a 4 GeV recirculating accelerator. Each of the accelerator`s two linacs contains 160 superconducting radio frequency (SRF) 1497 MHz niobium cavities in 20 cryomodules. Alignments of the cavities within the cryomodule with respect to beam axis is critical to achieving the optimum accelerator performance. This paper discusses the rationale for the current specification on cavity mechanical alignment: 2 mrad (rms) applied to the 0.5 m active length cavities. We describe the tooling that was developed to achieve the tolerance at the time of cavity pair assembly, to preserve and integrate alignment during cryomodule assembly, and to translate alignment to appropriate installation in the beam line.
Research Organization:
Southeastern Universities Research Association, Inc., Newport News, VA (United States). Continuous Electron Beam Accelerator Facility
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
10172768
Report Number(s):
DOE/ER/40150--211; CEBAF-PR--93-017; CONF-930511--240; ON: DE93017505
Country of Publication:
United States
Language:
English

Similar Records

Thermal performance of the CEBAF superconducting linac cryomodule
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:45452

Jefferson Lab IR FEL cryomodule modifications and test results
Conference · Sun Jun 01 00:00:00 EDT 1997 · OSTI ID:489631

CEBAF: Project Status and Front End Test Results
Conference · Tue Sep 01 00:00:00 EDT 1992 · OSTI ID:954318