The AGS New Fast Extracted Beam System orbit bump pulser
Conference
·
OSTI ID:10167894
The AGS New Fast Extracted Beam System (New FEB) is designed for RHIC injection and the g-2 experiment, performing single bunch multiple extraction at the prf of 20 to 100 Hz up to 12 times per AGS cycle. Capacitor-discharge pulsers are required to produce local orbit bumps at the fast kicker and ejector magnet locations. These pulsers have to deliver half-sine current pulses at 1 KA peak with a base width of 5 msec. The discharge voltage will require approximately 800V with a {plus_minus}0.1% accuracy. Direct charging will require a charger too costly and difficult to build because of the high prf. An alternative charging system is being developed to take advantage of the 1.5 sec idle time between each group of pulses. The charger power supply ratings and regulation requirements are thus greatly reduced. The system analysis and results from a prototype will be presented.
- Research Organization:
- Brookhaven National Lab., Upton, NY (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 10167894
- Report Number(s):
- BNL--48274; CONF-930511--201; ON: DE93016155
- Country of Publication:
- United States
- Language:
- English
Similar Records
The AGS New Fast Extracted Beam System orbit bump pulser
Testing the New FEB Bumps (AGS Studies Report No. 334)
The AGS accelerator complex with the new fast extraction system
Conference
·
Thu Dec 31 23:00:00 EST 1992
·
OSTI ID:7368692
Testing the New FEB Bumps (AGS Studies Report No. 334)
Technical Report
·
Tue Aug 08 00:00:00 EDT 1995
·
OSTI ID:1132412
The AGS accelerator complex with the new fast extraction system
Conference
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:50920