skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: NaK pool-boiler bench-scale receiver durability test: Test design and initial results

Conference ·
OSTI ID:10162039

Pool-boiler reflux receivers have been considered as an alternative to heat pipes for the input of concentrated solar energy to Stirling-cycle engines in dish-Stirling electric generation systems. Fool boilers offer simplicity in desip and fabrication. Pool-boiler solar receiver operation has been demonstrated for short periods of time. However, in order to generate cost-effective electricity, the receiver must operate without significant maintenance for the entire system life. At least one theory explaining incipient-boiling behavior of alkali metals indicates that favorable start-up behavior should deteriorate over time. Many factors affect the stability and startup behavior of the boiling system. Therefore, it is necessary to simulate the full-scale design in every detail as much as possible, including flux levels materials, and operating cycles. On-sun testing is impractical due to the limited test time available. No boiling system has been demonstrated with the current porous boiling enhancement surface and materials for a significant period of time. A test vessel was constructed with a Friction Coatings Inc. porous boiling enhancement surface. The vessel is heated with a quartz lamp array providing about 92 W/Cm{sup 2} peak incident thermal flux. The vessel is charged with NaK-78, which is liquid at room temperature. This allows the elimination of costly electric preheating, both on this test and on full-scale receivers. The vessel is fabricated from Haynes 230 alloy, selected for its high temperature strength and oxidation resistance. The vessel operates at 750{degrees}C around the clock, with a 1/2-hour shutdown cycle to ambient every 8 hours. Temperature data is continually collected. The test design and initial (first 2500 hours and 300 start-ups) test data are presented here. The test is designed to operate for 10,000 hours, and will be complete in the spring of 1994.

Research Organization:
Sandia National Labs., Albuquerque, NM (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-76DP00789
OSTI ID:
10162039
Report Number(s):
SAND-93-1208C; CONF-930804-4; ON: DE93014930
Resource Relation:
Conference: 28. intersociety energy conversion engineering conference,Atlanta, GA (United States),8-13 Aug 1993; Other Information: PBD: [1993]
Country of Publication:
United States
Language:
English