Title: Provisional process specifications for fabrication of KIT and KIIT target elements for K Reactor E-N load (PT-IP-561-C)

Technical Report ·
DOI:https://doi.org/10.2172/10148429· OSTI ID:10148429

It is necessary to modify existing I&E fuel element components to produce the requested target elements by early April 1963. Normally, a minimum of eighteen weeks is required to produce components of a new design. Therefore, the finished target elements will not be of the optimum designed dimensions. The proposed minor deviations have been approved by Reactor Engineering for the demonstration load. It is anticipated that only these test quantities will be fabricated to these dimensions. These provisional process specifications are established on this basis and are subject to change as the fabrication techniques are developed.

Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10148429
Report Number(s):
HW-77183; ON: DE94011284
Resource Relation:
Other Information: DN: Declassified; PBD: 20 Mar 1963