Flow increase: C reactor
At the request of B-C Maintenance Engineering, this study was initiated to investigate the feasibility of replacing the 190-C and 105-C process water flow-meter orifices with venturi tubes. Specific aspects of the problem studied were potential flow increases, accompanying production increases, costs, and the ability of the existing 190-C pumps and motors to provide the potential flow increase.
- Research Organization:
- General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-76RL01830
- OSTI ID:
- 10145130
- Report Number(s):
- HW--69530; ON: DE94010474
- Country of Publication:
- United States
- Language:
- English
Similar Records
Process water flow tests, C Reactor
Effects of 100-K water plant expansion on Panellits and orifices
C Reactor reorificing analysis
Technical Report
·
Mon Apr 10 23:00:00 EST 1961
·
OSTI ID:10146540
Effects of 100-K water plant expansion on Panellits and orifices
Technical Report
·
Tue Dec 01 23:00:00 EST 1959
·
OSTI ID:10171793
C Reactor reorificing analysis
Technical Report
·
Mon Jan 11 23:00:00 EST 1954
·
OSTI ID:10137607