Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Flow increase: C reactor

Technical Report ·
DOI:https://doi.org/10.2172/10145130· OSTI ID:10145130
At the request of B-C Maintenance Engineering, this study was initiated to investigate the feasibility of replacing the 190-C and 105-C process water flow-meter orifices with venturi tubes. Specific aspects of the problem studied were potential flow increases, accompanying production increases, costs, and the ability of the existing 190-C pumps and motors to provide the potential flow increase.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10145130
Report Number(s):
HW--69530; ON: DE94010474
Country of Publication:
United States
Language:
English

Similar Records

Process water flow tests, C Reactor
Technical Report · Mon Apr 10 23:00:00 EST 1961 · OSTI ID:10146540

Effects of 100-K water plant expansion on Panellits and orifices
Technical Report · Tue Dec 01 23:00:00 EST 1959 · OSTI ID:10171793

C Reactor reorificing analysis
Technical Report · Mon Jan 11 23:00:00 EST 1954 · OSTI ID:10137607