Groundwater quality assessment/corrective action feasibility plan: New TNX Seepage Basin
The New TNX Seepage Basin is located across River Road east of the TNX Area at the Savannah River Site. Currently the basin is out of service and is awaiting closure in accordance with the Consent Decree settled under Civil Act No. 1:85-2583. Groundwater monitoring data from the detection monitoring network around the New TNX Seepage Basin was recently analyzed using South Carolina Hazardous Waste Management Regulations R.61-79.264.92 methods to determine if groundwater downgradient of the New TNX Seepage Basin had been impacted. Results from the data analysis indicate that the groundwater has been impacted by inorganic constituents with no associated health risks. The impacts resulting from elevated levels of inorganic constituents, such as Mn, Na, and Total PO{sub 4} in the water table, do not pose a threat to human health and the environment.
- Research Organization:
- Savannah River Site (SRS), Aiken, SC (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC09-89SR18035
- OSTI ID:
- 10142008
- Report Number(s):
- WSRC-RP-89-1324; ON: DE92013140
- Resource Relation:
- Other Information: PBD: 5 Dec 1989
- Country of Publication:
- United States
- Language:
- English
Similar Records
Groundwater quality assessment/corrective action feasibility plan. Savannah River Laboratory Seepage Basins
Groundwater quality assessment/corrective action feasibility plan
Related Subjects
SAVANNAH RIVER PLANT
WASTE MANAGEMENT
GROUND WATER
MONITORING
DRAINAGE
SOUTH CAROLINA
HAZARDOUS MATERIALS
RADIOACTIVE WASTES
REGULATIONS
ENVIRONMENTAL IMPACTS
HYDROLOGY
GEOLOGY
AQUIFERS
WATER QUALITY
COMPILED DATA
REMEDIAL ACTION
FEASIBILITY STUDIES
540250
SITE RESOURCE AND USE STUDIES