Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

SIMULATIONS OF TRANSVERSE STACKING IN THE NSLS-II BOOSTER

Conference ·
OSTI ID:1013533

The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The linac needs to deliver 15 nC in 80 - 150 bunches to the booster every minute to achieve current stability goals in the storage ring. This is a very stringent requirement that has not been demonstrated at an operating light source. We have developed a scheme to transversely stack two bunch trains in the NSLS-II booster in order to alleviate the charge requirements on the linac. This scheme has been outlined previously. In this paper we show particle tracking simulations of the tracking scheme. We show simulations of the booster ramp with a stacked beam for a variety of lattice errors and injected beam parameters. In all cases the performance of the proposed stacking method is sufficient to reduce the required charge from the linac. For this reason the injection system of the NSLS-II booster is being designed to include this feature. The NSLS-II injection system consists of a 200 MeV linac and a 3 GeV booster. The injectors must provide 7.5nC in bunch trains 80-150 bunches long every minute for top off operation of the storage ring. Top off then requires that the linac deliver 15nC of charge once losses in the injector chain are taken into consideration. This is a very stringent requirement that has not been demonstrated at an operating light source. For this reason we have developed a method to transversely stack two bunch trains in the booster while maintaining the charge transport efficiency. This stacking scheme has been discussed previously. In this paper we show the simulations of the booster ramp with a single bunch train in the booster. Then we give a brief overview of the stacking scheme. Following, we show the results of stacking two bunch trains in the booster with varying beam emittances and train separations. The behavior of the beam through the ramp is examined showing that it is possible to stack two bunch trains in the booster.

Research Organization:
BROOKHAVEN NATIONAL LABORATORY (BNL)
Sponsoring Organization:
DOE - Office Of Science
DOE Contract Number:
AC02-98CH10886
OSTI ID:
1013533
Report Number(s):
BNL--94864-2011-CP; 39KC02000
Country of Publication:
United States
Language:
English

Similar Records

NSLS-II Booster Acceptance Studies
Conference · Mon May 04 00:00:00 EDT 2009 · OSTI ID:958694

NSLS-II Booster Design
Technical Report · Sun Nov 15 23:00:00 EST 2009 · OSTI ID:1480933

NSLS-II injector commissioning and initial operation
Conference · Sun May 03 00:00:00 EDT 2015 · OSTI ID:1193208