skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The dipole corrector magnets for the RHIC fast global orbit feedback system

Conference ·
OSTI ID:1011453

The recently completed RHIC fast global orbit feedback system uses 24 small 'window-frame' horizontal dipole correctors. Space limitations dictated a very compact design. The magnetic design and modelling of these laminated yoke magnets is described as well as the mechanical implementation, coil winding, vacuum impregnation, etc. Test procedures to determine the field quality and frequency response are described. The results of these measurements are presented and discussed. A small fringe field from each magnet, overlapping the opposite RHIC ring, is compensated by a correction winding placed on the opposite ring's magnet and connected in series with the main winding of the first one. Results from measurements of this compensation scheme are shown and discussed.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States). Relativistic Heavy Ion Collider (RHIC)
Sponsoring Organization:
DOE - Office Of Science
DOE Contract Number:
DE-AC02-98CH10886
OSTI ID:
1011453
Report Number(s):
BNL-94134-2011-CP; R&D Project: KBCH139; 18041; KB0202011; TRN: US1102174
Resource Relation:
Conference: 2011 Particle Accelerator Conference (PAC'11); New York, NY; 20110328 through 20110401
Country of Publication:
United States
Language:
English