Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Final report: Pile technology Development Test 105-571-A: Molded ribbed sphincter seal and seal leakage test for the ``C`` horizontal rod

Technical Report ·
DOI:https://doi.org/10.2172/10104691· OSTI ID:10104691
Since 105-C Pile was designed without thimbles, gas seals are required on all horizontal control rods to prevent the pile gases from escaping and contaminating the atmosphere.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
10104691
Report Number(s):
HW--38221; ON: DE93003409
Country of Publication:
United States
Language:
English