Status of the PEP-II asymmetric B-Factory
Conference
·
OSTI ID:10102016
The PEP-II project is an e{sup +}e{sup {minus}} storage ring complex with unequal energy beams to study CP violation in the B meson system. High luminosity requires a large number of bunches and a low value of beta at the collision point. The high beam current requires advances in vacuum chambers, damped RF cavities, and feedback systems. Machine elements inside the detector are required to achieve low beta values and magnetic separation.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00098; AC03-76SF00515; AC03-81ER40050; AS03-76ER70285; W-7405-ENG-48
- OSTI ID:
- 10102016
- Report Number(s):
- SLAC-PUB--6714; CONF-940816--55; ON: DE95004291; 35KA02000/35KS01000; 35HK02010/35KA02000
- Country of Publication:
- United States
- Language:
- English
Similar Records
An asymmetric B Factory based on PEP
RF system research and development for the PEP-II B factory
RF System Research and Development for the PEP-II B Factory
Conference
·
Fri Jun 01 00:00:00 EDT 1990
·
OSTI ID:6876020
RF system research and development for the PEP-II B factory
Conference
·
Fri Dec 30 23:00:00 EST 1994
·
OSTI ID:200406
RF System Research and Development for the PEP-II B Factory
Journal Article
·
Mon Oct 31 23:00:00 EST 1994
· Nuclear Instruments and Methods in Physics Research B
·
OSTI ID:841040