skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Electrical measurements during magnet construction

Conference ·
OSTI ID:5819856

Throughout the construction phase of the cold mass for SSC magnets, electrical tests are made to determine that no faults in the coil structure have developed. These tests include ones designed to measure turn-to-turn voltage hold-off, hypot tests to ground, coil resistance, and instrumentation checks. These various tests will be described and the test parameters that are used will be covered. 4 figs.

Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5819856
Report Number(s):
BNL-42044; CONF-890270-21; ON: DE89015110
Resource Relation:
Conference: International industrial symposium on the super collider, New Orleans, LA, USA, 8-10 Feb 1989; Other Information: Portions of this document are illegible in microfiche products
Country of Publication:
United States
Language:
English