Title: Electrical insulation requirements and test procedures for SSC dipole magnets

Conference ·
OSTI ID:6540266

The development of the basic requirements for the turn-to-turn, coil-to-coil, and coil-to-ground insulation for SSC dipoles is discussed. The insulation method is also described along with test procedures for verification of insulation integrity. Electrical tests are performed throughout the magnet assembly and fabrication process to verify that coil integrity and insulation quality of the various components and sub-assemblies are within nominal limits. These tests are also required to certify each dipole for SSC acceptance before it is installed in the cryostat and leaves the factory for final installation. The following series of tests, which are conducted at room temperature, are: resistance; inductance and Q''; hypot; impulse; and ratiometer.

Research Organization:
Brookhaven National Lab., Upton, NY (USA)
Sponsoring Organization:
DOE/ER
DOE Contract Number:
AC02-76CH00016
OSTI ID:
6540266
Report Number(s):
BNL-43378; CONF-900348-14; ON: DE91000907
Resource Relation:
Conference: 2. international industrial symposium on the super collider, Miami, FL (USA), 14-16 Mar 1990
Country of Publication:
United States
Language:
English