Electrical insulation requirements and test procedures for SSC dipole magnets
The development of the basic requirements for the turn-to-turn, coil-to-coil, and coil-to-ground insulation for SSC dipoles is discussed. The insulation method is also described along with test procedures for verification of insulation integrity. Electrical tests are performed throughout the magnet assembly and fabrication process to verify that coil integrity and insulation quality of the various components and sub-assemblies are within nominal limits. These tests are also required to certify each dipole for SSC acceptance before it is installed in the cryostat and leaves the factory for final installation. The following series of tests, which are conducted at room temperature, are: resistance; inductance and Q''; hypot; impulse; and ratiometer.
- Research Organization:
- Brookhaven National Lab., Upton, NY (USA)
- Sponsoring Organization:
- DOE/ER
- DOE Contract Number:
- AC02-76CH00016
- OSTI ID:
- 6540266
- Report Number(s):
- BNL-43378; CONF-900348-14; ON: DE91000907
- Resource Relation:
- Conference: 2. international industrial symposium on the super collider, Miami, FL (USA), 14-16 Mar 1990
- Country of Publication:
- United States
- Language:
- English
Similar Records
SSC 50 mm dipole magnet cryostat thermal measurement results
SSC 50 mm dipole magnet cryostat thermal measurement results
Related Subjects
SUPERCONDUCTING MAGNETS
ELECTRICAL INSULATION
TESTING
MAGNETIC DIPOLES
SPECIFICATIONS
SUPERCONDUCTING SUPER COLLIDER
DIPOLES
ELECTRICAL EQUIPMENT
ELECTROMAGNETS
EQUIPMENT
MAGNETS
MULTIPOLES
STORAGE RINGS
SUPERCONDUCTING DEVICES
430303* - Particle Accelerators- Experimental Facilities & Equipment